CNC machine factory inspection checklist

Inspect the serialised machine in the order, verify every included component and run the agreed program before packing starts.

Minimum inspection scope

Match the nameplate and configuration to the purchase order, test safety and utilities, run the buyer's representative part, measure the result, record alarms and then verify documents, accessories and packing.

Before the machine runs

  • Match model, serial/identification plate and quotation revision.
  • Photograph spindle(s), drilling groups, controller, drives, vacuum pump and electrical cabinet.
  • Check working area and included tables, clamps, tools, holders and accessories.
  • Confirm voltage/frequency/phase labels and utility requirements.

Representative run test

TestMeasurementRecord
Cutting/routingLength, width, groove/pocket and edge conditionTool, material, passes and cycle
DrillingPosition, diameter, depth and tear-outHole face/direction and program input
RepeatabilityRepeated parts or hole patternsSample count and measuring method
WorkflowTool changes, labels, data input and alarmsFull uncut video where practical
Safety/functionsStops, interlocks and operating controlsChecklist signed by both parties

Documents and packing

ManualsOperation, maintenance and electrical documentation.
BackupsController parameters, software and configuration files where applicable.
AccessoriesTooling, collets, holders, sensors and loose parts.
Spare partsAgreed startup spares and wear items.
PackingMoisture protection, blocking, labels and case list.
Shipping filePacking list and required destination documents.

Request a pre-shipment test plan

Send panel size, material, required operations, target output, voltage and destination country.

Request a factory quote

CNC pre-shipment inspection questions

Can a CNC machine inspection be completed by live video?

Video can verify identity, configuration and a continuous run when travel is not practical. Use a shot list, visible measurements and an agreed witness time.

Who should define the pass and fail criteria?

Buyer and supplier should agree the criteria before the test. The document should name the part, tolerance, finish, cycle method and required evidence.

Should the machine be packed before final approval?

No. Complete the run-off, corrections and acceptance record first. Packing inspection follows after the machine is approved for shipment.

What photos should be included in the inspection report?

Include the nameplate, control cabinet, major components, machine overview, test material, measurements, included tools, spare parts and packing marks.