Woodworking machinery manufacturer since 1994 · Renqiu, Hebei, China
Home / CNC routers / YMK-IV
Four-process CNC router

YMK-IV four-spindle CNC router

The YMK-IV uses four prepared spindle positions for cabinet and panel jobs that repeat a stable set of cutting, routing and grooving tools.

YMK-IV four spindle CNC router
Best use for YMK-IV

YMK-IV suits factories whose main programs can be completed with four recurring tools. It avoids a separate tool magazine, but the spindle powers, tool assignments and clearance must match the actual parts.

Best fit

Multi-tool routing without a separate ATC magazine.

YMK-IV is an economical route for furniture factories that need several cutters available in one program. The four-spindle arrangement supports a predictable workflow for common panel-furniture jobs.

01
Four ready tools

Switch between prepared spindle tools according to the machining program.

02
Cut, route and groove

Suitable for common operations in cabinet, wardrobe and panel-component production.

03
Vacuum panel table

The supplied machine image shows vacuum workholding for sheet processing.

04
Clear upgrade path

Compare this architecture with YMK-I ATC when jobs require more tool positions or higher product variety.

Specification note

Confirm the current factory build.

The catalog product page does not provide a full technical table for YMK-IV. Request the current working area, spindle powers, controller, drive system, vacuum pump, voltage, dust collection and included tooling before purchase.

Request verified specification
Verified specification record

YMK-IV specification, evidence and buyer checks.

The table separates published catalog facts from items that need current factory confirmation. Use it as a quotation and inspection checklist.

SpecificationPublished or required valueEvidence / buyer action
Machine architectureFour independent spindle positionsIdentified in supplied product material
Primary applicationPanel cutting, routing and groovingConfirm with buyer tool list
WorkholdingVacuum panel table shownConfirm pump power and zones
Working area / Z travelCurrent factory configuration requiredMatch full workpiece range
Spindle power / speedCurrent factory configuration requiredConfirm every spindle, not only total power
Tool allocationFour tools to be defined for the processList cutter type and operation
Control and drive systemCurrent factory configuration requiredRecord brands and model numbers
Positioning / repeatabilityCurrent factory test requiredUse an agreed representative part
Electrical supplyDestination-specific confirmation requiredState voltage, phase and frequency
Vacuum pump / dust extractionQuotation confirmation requiredConfirm included/excluded equipment
Software and post-processorWorkflow confirmation requiredTest buyer files before shipment
Machine size / shipping weightCurrent packing list requiredRequired for layout and freight
Included tooling / spare partsItemized quotation requiredSeparate standard and optional items

What the quotation should include

ConfigurationModel revision, working range, spindle/drilling groups, controller, drives and options.
UtilitiesVoltage, frequency, phase, air, extraction, network and floor requirements.
Commercial scopeIncoterm, packing, lead time, payment stages and destination documents.
AcceptanceRepresentative material, program, tools, tolerances, cycle method and evidence.
SupportManuals, training, remote guidance, warranty boundaries and spare parts.
Line interfacesSoftware, labels, file formats, upstream/downstream machines and operator handoff.

YMK-IV four-process CNC router questions

What does four-process CNC router mean?

It refers to a machine with four prepared spindle positions that the program selects for different operations. The exact spindle and tool arrangement is defined in the quotation.

Can the four spindles use different cutters?

Yes. Each position can be prepared for a defined operation, subject to the quoted collets, tool dimensions, spindle power and safe clearance.

Is YMK-IV faster than an ATC CNC router?

It can reduce tool-change delay for a stable four-tool program. Total output still depends on cutting parameters, nesting layout, loading, vacuum hold-down and downstream drilling.

What information is needed for a YMK-IV quotation?

Provide the four intended tools, panel material, thickness range, sheet size, operations, output target, voltage and software or post-processor requirement.

Reviewed 2026-10-22 by the Yongmao Product Team for factory buyers, importers, integrators and distributors. Product suitability remains subject to workpiece review and a signed acceptance plan.
YMK-IV inquiry

Tell us which four tools your process needs.

Share your panel material, thickness, operations, output target, voltage and destination country.

WhatsApp sales

Your enquiry will be sent securely to the Yongmao sales group. We will use the contact you provide to reply.